There are no plants in blossom on February the 4th.
The earliest date currently listed is Mar 15, and the latest date is Nov 11 |
Thumbnail pages:
"FIFE" to "A"
- "A" to "B"
- "B" to "C" (Rail)
- "B" to "C" (Road)
- "A" to "mt"
- "C" to "F"
- "C" to "A"
- "B" to "mt"
- "F" to "D" (Fill)
- "F" to "D" (Vernal Pools)
- "C" to "E" p-1
- "C" to "E" p-2
- "D" to "C"
- "D" to "E"
- "E" to "F"
- "PARK" to "M"
- "M" to "B"
- "C" to "B" p-1
- "C" to "B" p-2
- "mt" to "S"
- "S" to "PARK"
- "X" to "Z"
This series of 21 photos were taken on Feb 27 2000. They're from the
beginning of the Fill, southwest to the Westfield river. Once the train ran from West Springfield to Feeding Hills. The Fill kept the tracks at the same elevation as the bridge leading to the other side. Both the tracks and the bridge are gone now, but the Fill and the support structures still remain.Slide Show pages: "FIFE" to "A" - "A" to "B" - "B" to "C" (Rail) - "B" to "C" (Road) - "A" to "mt" - "C" to "F" - "C" to "A" - "B" to "mt" - "F" to "D" (Fill) - "F" to "D" (Vernal Pools) - "C" to "E" p-1 - "C" to "E" p-2 - "D" to "C" - "D" to "E" - "E" to "F" - "PARK" to "M" - "M" to "B" - "C" to "B" p-1 - "C" to "B" p-2 - "mt" to "S" - "S" to "PARK" - "X" to "Z" the Surficial Geology page PDF version (opens a new window)
Images download size : 1,914,376 bytes
0 of 21 images have been downloaded
Image: 01 Image: 02 Image: 03 Image: 04 Image: 05 Image: 06 Image: 07 Image: 08 Image: 09 Image: 10 Image: 11 Image: 12 Image: 13 Image: 14 Image: 15 Image: 16 Image: 17 Image: 18 Image: 19 Image: 20 Image: 21Choices from (D) Downstream along the Westfield river to the southern tip of the Penninsula along the Southwest Shore 16 photos Feb 27 2000. To intersection (C) under the Power Lines 13 photos May 7 2000. For a geological depiction of the fill check out the Surficial Geology page. | |||||||
|
|
||||||||